Project: | David Jones, Macquarie Centre
Due to this project having a short time-frame and extremely intricate internal & external corners, as well as angled elements, it was near impossible for contractors to frame this onsite and set conventionally. Our solution was to produce these sections in our factory so onsite all that was needed was to hang the sheeted frames and set the joints. |
Material: | MDF frames lined in plasterboard profiles – |
Fabrication Method: | CNC machined MDF framework lined in plasterboard
We also had to build in expansion joints by overhanging or leaving the frame short. |
Contractor: | Speedy Ceilings |